Precedents database
-
2.3 Implementing processes – AEQES – Compliance (2017) consistent follow up procedures
AEQES
Application Renewal Review Full, coordinated by ENQA Decision of 20/06/2017 Standard 2.3 Implementing processes Keywords consistent follow up procedures Panel conclusion Full compliance Clarification request(s) – RC decision Compliance “The Register Committee noted that AEQES has acted on the recommendations made in the 2011 review and adopted reinforced follow-up procedures in 2015.”
Full decision: see agency register entry
-
2.3 Implementing processes – MusiQuE – Compliance (2016) consistent follow-up policy
MusiQuE
Application Initial Review Full, coordinated by NASM Decision of 06/06/2016 Standard 2.3 Implementing processes Keywords consistent follow-up policy Panel conclusion Substantial compliance Clarification request(s) – RC decision Compliance “The Review Panel noted that the follow-up procedure is only compulsory for MusiQuE’s accreditation reviews at present.While the Register Committee acknowledged that it is more difficult to impose a follow-up procedure in a voluntary review than an obligatory one, the Committee underlined that MusiQuE is free to design the contractual conditions and requirements for institutions.The Register Committee thus noted the Review Panel’s recommendation that MusiQuE should implement a consistent follow-up policy for all different types of review.”
Full decision: see agency register entry
-
2.3 Implementing processes – HCERES – Partial compliance (2022) follow-up with limited value added, no students interviewed in site visits
HCERES
Application Renewal Review Full, coordinated by ENQA Decision of 28/06/2022 Standard 2.3 Implementing processes Keywords follow-up with limited value added, no students interviewed in site visits Panel conclusion Substantial compliance Clarification request(s) Panel (14/06/2022)
RC decision Partial compliance “18. The panel noted that HCERES programme evaluation panels do not meet with students during review visits. The panel discussed the new follow-up process introduced for institutional evaluation only, but noted that some questions remained regarding the added value given that there is no analysis or feedback in direct response to follow-up reports.
19. The panel considered that HCERES made improvements since the last review, as site visits were not carried out for programme evaluations at all previously and given there was no follow-up process previously.
20. While the Register Committee acknowledged that significant progress has been made, it did not consider that HCERES complies with the standard yet in light of the limited added value of the follow-up process and the fact that students are not interviewed during site visits. The Committee therefore did not concur with the panel, but concluded that HCERES remains partially compliant with ESG 2.3.”
Full decision: see agency register entry
-
2.3 Implementing processes – THEQC – Compliance (2021) new accreditation programm, follow-up process not yet defined.
THEQC
Application Initial Review Full, coordinated by ENQA Decision of 18/03/2021 Standard 2.3 Implementing processes Keywords new accreditation programm, follow-up process not yet defined. Panel conclusion Substantial compliance Clarification request(s) Agency (09/10/2020)
RC decision Compliance “Compliance Compliance While the Register Committee noted – from the agency’s statement to the review report – that THEQC had introduced the new maturity levels for internal QA systems, the Committee was unclear whether any changes were made to the agency’s follow-up processes and has therefore sought further clarification from the agency.The agency explained in its clarification letter that an Institutional Follow-up Program (IFuP) was initiated at the beginning of 2020 and it is carried out for all institutions that have passed through an initial institutional external evaluation. The follow-up team performs a preliminary check of the institutional self-evaluation reports, performance indicators and other additional documents followed by a one-day online site-visit, which results in an Institutional Follow-up Report (IFuR) published by THEQC.
The Committee further noted that THEQC has only just initiated the Institutional Accreditation Programme (IAP); the follow-up process for this procedure has not yet been defined. new accreditation programm, follow-up process not yet defined.”
Full decision: see agency register entry
-
2.3 Implementing processes – EVALAG – Partial compliance (2024) Follow-up
EVALAG
Application Renewal Review Targeted, coordinated by ENQA Decision of 02/07/2024 Standard 2.3 Implementing processes Keywords Follow-up Panel conclusion Partial compliance Clarification request(s) – RC decision Partial compliance “11. The Register Committee, noted in the analysis by the panel that evalag’s review procedures include a self-assessment report and an external assessment followed by expert’s report, but no follow-up activities, unless related to conditions/requirements established by evalag when taking the corresponding decision.
12. Given the concerns on the lack of consistent follow-up in all of evalag's procedures the Register Committee concurred with the panel that evalag complies only partially with the standard.”
Full decision: see agency register entry
-
2.3 Implementing processes – IEP – Compliance (2024) Implementing processes
IEP
Application Renewal Review Targeted, coordinated by ENQA Decision of 04/04/2024 Standard 2.3 Implementing processes Keywords Implementing processes Panel conclusion Compliance Clarification request(s) – RC decision Compliance “9. In the last review, the agency was found to be partially compliant with the standard as the follow-up model did not ensure a consistent follow-up for all evaluated higher education institutions.
10. The Register Committee noted from the panel’s analysis IEP’s efforts in addressing the shortcomings with the standards. Furthermore, the Committee noted that IEP took further measures to increase the rate of submission of follow-up reports by evaluated higher education institutions. .
11. The Register Committee therefore concurred with the panel's conclusion that IEP complies with the standard.”
Full decision: see agency register entry
-
2.3 Implementing processes – AQUIB – Compliance (2024) Informing stakeholders
AQUIB
Application Initial Review Full, coordinated by ENQA Decision of 27/11/2024 Standard 2.3 Implementing processes Keywords Informing stakeholders Panel conclusion Compliance Clarification request(s) – RC decision Compliance “9. The Register Committee understood from the panel’s analysis, that while external quality assurance processes are in line with the standard, there are discrepancies in understanding the processes of drafting and finalising review reports, as well as the role of the QA expert in the Commission of Study Programmes Evaluation (CET).
10. The Register Committee could follow the panel's view that the agency is compliant with standard, but emphasized the panel's recommendation that the agency should ensure that all stakeholders are effectively informed about the entire external evaluation process.”
Full decision: see agency register entry
-
2.3 Implementing processes – AKKORK – Compliance (2020) Lack follow-up procedures
AKKORK
Application Renewal Review Full, coordinated by ENQA Decision of 22/06/2020 Standard 2.3 Implementing processes Keywords Lack follow-up procedures Panel conclusion Partial compliance Clarification request(s) – RC decision Compliance “In its decision of inclusion, the Register Committee noted that AKKORK’s follow-up procedures were not consistently implemented for all off the agency’s external quality assurance activities and therefore flagged this matter for future attention. In its 2019 review report, the panel showed that AKKORK had taken steps to address its flag by including follow-up processes as part of its contracts with higher education institutions. The panel found that - while follow-ups are not part of all contracts signed with the reviewed institutions, that they are nevertheless carried out after a conditional accreditation. The panel further underlined a number of shortcomings related to AKKORK’s independent accreditation reviews at institutional level and AKKORK’s IQAS procedures. Since these procedures are no longer on offer by AKKORK, the Register Committee found that the panel’s concerns were therefore addressed”
Full decision: see agency register entry
-
2.3 Implementing processes – QQI – Partial compliance (2019) incomplete implementation of reviews for independent private providers
QQI
Application Renewal Review Full, coordinated by ENQA Decision of 05/11/2019 Standard 2.3 Implementing processes Keywords incomplete implementation of reviews for independent private providers Panel conclusion Substantial compliance Clarification request(s) – RC decision Partial compliance “In its 2016 decision on QQI's Substantive Change Report, the Register Committee flagged for attention the use of site visits. The Committee noted that site visits are not used in some processes, but that this was adequately explained by a “lighter touch in recognition of the greater responsibility held by those providers” (p. 27). The Register Committee concurred with the panel that the alternative approach used is effective and robust in the light of the process' objectives.The Register Committee noted that QQI has finalised its external quality assurance processes and moved to full implementation of most processes since the last review.The external review report, however, noted that for independent private providers “no cyclical institutional reviews have taken place as a result of the delay in approving those providers’ Quality Assurance Procedures through Re-engagement” (p. 28). While the report cited a combination of reasons for that and underlined that it was not the result of poor intentions on the part of the agency, the report noted that some providers may actually go up to 12 years without an institutional review. The panel further noted that the “risk of concerns about quality going unnoticed in these providers” was partly, but not wholly, mitigated by QQI having more intensive engagement with them through theirprogramme validation relationship (p. 28).In light of the incomplete implementation of reviews for independent private providers the Register Committee was unable to concur with the panel's conclusion of compliance, but considered that QQI only partially complies with the standard.”
Full decision: see agency register entry
-
2.3 Implementing processes – EVALAG – Compliance (2019) Implementation of follow-up procedures; accreditations carried out without a site visit
EVALAG
Application Renewal Review Full, coordinated by ENQA Decision of 05/11/2019 Standard 2.3 Implementing processes Keywords Implementation of follow-up procedures; accreditations carried out without a site visit Panel conclusion Full compliance Clarification request(s) – RC decision Compliance “For accreditation in Germany, the Register Committee underlined that evalag retains responsibility for follow-up to take place, even if GAC makes the accreditation decisions under the new legal framework. This does not exclude that GAC actually implements the follow-up processes, as long as evalag has assured itself that this indeed happens.Given the small number of accreditations under the new legal framework thus far, it was not possible to analyse the actual practice at this point. The Register Committee therefore noted that this is a matter for further attention in future reviews of evalag.While the German legal framework potentially allows for an accreditation procedure to be carried out without a site visit, the panel understood from evalag that the agency did not plan to make use of that option. The Register Committee underlined that it might be helpful if evalag would point that out in its official documentation.Notwithstanding the above remarks, the Register Committee concurred with the panel's conclusion that evalag complies with the standard”
Full decision: see agency register entry
-
2.3 Implementing processes – NCEQE – Compliance (2019) unclear monitoring processes
NCEQE
Application Initial Review Full, coordinated by ENQA Decision of 19/06/2019 Standard 2.3 Implementing processes Keywords unclear monitoring processes Panel conclusion Substantial compliance Clarification request(s) Agency (06/06/2019)
RC decision Compliance “The review panel found that the agency’s monitoring processes - the follow-up and case-based monitoring procedure - were not fully clear, and in particular on how these processes would be complementing each other. The Register Committee therefore asked the agency for further clarification.The agency explained (see letter of 06/06/2019) that higher education institutions complete a mandatory follow-up process which takes place onceevery three years, where HEIs provide a self-evaluation on the progress made following its previous institutional evaluation. In addition, the agency may carry out a site-visit to review progress at the requested of the Authorization or Accreditation Councils following a review of the institution’s compliance with the authorisation/accreditation standards.The agency further described its case based monitoring procedure that is initiated in case a substantiated complaint is received about an institution. If the concern remains unresolved, NCEQE assembles a group of experts to investigate the complaint, which may include a site visit at the institution. Having considered the agency’s clarifications, the Register Committee found the follow-up processes well defined and reasonable. The Committeetherefore could follow the panel’s conclusion that NCEQE complies with ESG 2.3.”
Full decision: see agency register entry
-
2.3 Implementing processes – AHPGS – Compliance (2020) Follow-up of conditions unclear
AHPGS
Application Renewal Review Full, coordinated by ENQA Decision of 16/03/2020 Standard 2.3 Implementing processes Keywords Follow-up of conditions unclear Panel conclusion Substantial compliance Clarification request(s) – RC decision Compliance “16. For AHPGS' external quality assurance activities outside Germany, the review report concluded that AHPGS did not include follow-up as a mandatory step in the procedure. While the review report stated that “there are only recommendations, no conditions” in accreditation decisions outside Germany, the Register Committee noted that AHPGS had published (according to DEQAR as of 5/11/2019) at least 31 reports and decisions on programmes/institutions outside Germany that impose conditions in the decision. [...] it was not evident whether and how the fulfilment of these condition was verified, except for one case. […]
18. In its additional representation, AHPGS confirmed that also in accreditation/assessment procedures outside Germany conditions might be imposed (in cases with AHPGS final decision) or recommended (in cases where the decision is taken by a national authority). AHPGS further explained how these are followed up and noted that follow-up is now regulated formally in its contracts. AHPGS further explained that some mistakes were made when uploading the cases in question to DEQAR, which it had corrected.
19. The Register Committee could establish that the presentation of the reports in question was corrected in DEQAR. […]”
Full decision: see agency register entry
-
2.3 Implementing processes – IEP – Partial compliance (2019) Consistent follow-up
IEP
Application Renewal Review Full, coordinated by ENQA Decision of 03/04/2019 Standard 2.3 Implementing processes Keywords Consistent follow-up Panel conclusion Substantial compliance Clarification request(s) – RC decision Partial compliance “The Register Committee acknowledged the steps taken by IEP to enhance the participation in follow-up processes, but noted that the current follow-up model does not ensure for a consistent follow-up for all evaluated higher education institutions. The Committee considered that a progress report, which is a relatively light requirement, could possibly be a feasible follow-up for all evaluated institutions. The Committee took note of the panel's concern that making the requirement more stringent would pose a risk of turning progress reports into a purely formal requirement, but considered that such a risk had not necessarily to become true. Moreover, the same argument could be used against any obligatory element in quality assurance, or obligatory quality assurance as such.”
Full decision: see agency register entry
-
2.3 Implementing processes – Unibasq – Compliance (2019) strengthening follow-up procedures for voluntary international reviews
Unibasq
Application Renewal Review Full, coordinated by ENQA Decision of 05/11/2019 Standard 2.3 Implementing processes Keywords strengthening follow-up procedures for voluntary international reviews Panel conclusion Full compliance Clarification request(s) Agency (20/05/2019)
RC decision Compliance “The external review panel noted that for (voluntary) international accreditation procedures “the full responsibility to request any kind of follow-up lies in the hands of the institution”.The Register Committee considered the clarification by Unibasq that it follows up programmes' improvement plans in its international quality assurance activities, which is mentioned in the relevant protocol. Having considered Unibasq's clarification, the Register Committee was ableto concur with the panel's conclusion of compliance.The Register Committee, however, encouraged Unibasq to look into possibilities to strengthen its follow-up procedure for (voluntary) international reviews, and to clarify the expectation towards HEIs regarding the follow-up.”
Full decision: see agency register entry
-
2.3 Implementing processes – NOKUT – Compliance (2018) light systematic follow-up approach (compliant)
NOKUT
Application Renewal Review Full, coordinated by ENQA Decision of 06/12/2018 Standard 2.3 Implementing processes Keywords light systematic follow-up approach (compliant) Panel conclusion Partial compliance Clarification request(s) – RC decision Compliance “The panel noted that “actions taken by the institutions after the audit are not checked comprehensively”. While the panel noted that NOKUT provided an avenue for follow-up through seminars and conferences organised to discuss the audit findings and recommendation, it did consider those to be a systematic follow-up and noted that “the institutions do not feel obliged to implement the recommendations received”. The Register Committee considered that a very “light” approach to follow-up can be appropriate for (purely improvement-oriented) recommendations from an audit with an unconditionally positive outcome. Moreover, it considered that it was in the nature of a recommendation that there is no obligation to implement it.”
Full decision: see agency register entry
-
2.3 Implementing processes – ARACIS – Compliance (2019) Consistency in implementation of EQA procedures
ARACIS
Application Renewal Review Full, coordinated by ENQA Decision of 04/04/2019 Standard 2.3 Implementing processes Keywords Consistency in implementation of EQA procedures Panel conclusion Full compliance Clarification request(s) Panel (26/02/2021)
RC decision Compliance “In its response letter the panel stated that it is the responsibility of each Permanent Speciality Commission to ensure that judgements in ARACIS reports are accurate and consistent and the panel was convinced that all processes defined in the Methodology are implemented consistently.
Having found limited information in the panel’s analysis on the functioning of provisional authorisation for programmes and higher education institutions, the Committee has asked the panel to confirm that the key features of ESG 2.3 (self-assessment, external assessment, site visit, review report, follow-up) are implemented by ARACIS in these reviews.
In its response letter the panel confirmed that following the detailed examination of ARACIS’s Methodology and Guide, the agency followed the same procedures for provisional authorisation as the ones employed for the evaluation of accredited programmes, which were addressed by the panel in its review report (p. 31).Having considered the panel’s clarification the Register Committee was able to concur with the panel’s conclusion that ARACIS complies with the standard.
The Committee nevertheless underlined the panel’s suggestion on the need to further develop the follow-up procedures of the agency and to consider how institutions have addressed the ARACIS’s recommendations in their evaluation reports.”
Full decision: see agency register entry
-
2.3 Implementing processes – ANQA – Partial compliance (2017) follow up (ineffective and not reviewed by the panel); implementation of programme accreditation was not analysed by the panel
ANQA
Application Initial Review Full, coordinated by ENQA Decision of 20/06/2017 Standard 2.3 Implementing processes Keywords follow up (ineffective and not reviewed by the panel); implementation of programme accreditation was not analysed by the panel Panel conclusion Full compliance Clarification request(s) Panel (25/04/2025)
RC decision Partial compliance “The panel noted that it did not analyse the effectiveness of the monitoring process, normally taking place two years after accreditation, since it had not yet been implemented. The Register Committee sought and received clarification from the panel on the 6-monthly follow-up processes after conditional accreditations. The Committee understood that the panel did not consider the 6-monthly follow-up effective and, hence, recommended revisiting the 6-month period. The Register Committee further sought clarification from the panel concerning the programme accreditation process, since only pilot accreditations had been carried out so far. While the panel clarified that it had analysed how ANQA took into account the lessons learned from the pilots, it had not analysed the implementation of the pilots. While the Committee considered that the review report demonstrates that ANQA's process for programme accreditation includes the features required by the standard in theory, no statement could be made on actual practice at this point. One of the two follow-up processes appears to be considered ineffective by the panel, the other follow-up process was not reviewed by the panel and the implementation of programme accreditation was not analysed by the panel.”
Full decision: see agency register entry
-
2.3 Implementing processes – FINEEC – Compliance (2017) follow up procedure for programmes accredited without condition
FINEEC
Application Renewal Review Full, coordinated by ENQA Decision of 20/06/2017 Standard 2.3 Implementing processes Keywords follow up procedure for programmes accredited without condition Panel conclusion Full compliance Clarification request(s) – RC decision Compliance “In the review report (p. 28) the panel stated that if a programme is accredited with conditions, the programme is expected to submit an interim report on how it has fulfilled these conditions. The Register Committee was unclear if a follow-up is also implemented for programmes accredited without conditions and have therefore requested the panel to clarify this matter.The panel (response letter of 28/05/2017) stated that higher education institutions are expected to inform FINEEC of significant changes related to their programme organisation, implementation and development. The panel found no other evidence of a follow-procedure that would apply to programmes accredited without conditions. The Register Committee considered the design of the follow-up of programmes accredited without conditions to be minimal but nevertheless appropriate.”
Full decision: see agency register entry
-
2.3 Implementing processes – ACQUIN – Partial compliance (2016) Not clearly defined processes for institutional audits offered in Austria
ACQUIN
Application Renewal Review Full, coordinated by GAC Decision of 03/12/2016 Standard 2.3 Implementing processes Keywords Not clearly defined processes for institutional audits offered in Austria Panel conclusion Substantial compliance Clarification request(s) – RC decision Partial compliance “The review report demonstrates that ACQUIN's external quality assurance processes are clearly defined in public documents, except for institutional audits offered in Austria. The Register Committee concurred with the panel's view that the process should be clearly defined and published despite the low demand. The Register Committee took note of ACQUIN's statement on the external review report, which states that audits in Austria follow the same procedure as system accreditation in Germany. The Register Committee, however, understands from the review report that this is not stipulated in ACQUIN's public documentation. When ACQUIN's registration was last renewed, EQAR had flagged for attention whether ACQUIN’s international accreditation and evaluation activities take place on a clearly defined and transparent basis, within and beyond the EHEA. The Register Committee concluded that this flag has been resolved for ACQUIN's international accreditation activity in general, but not for audits in Austria”
Full decision: see agency register entry
-
2.3 Implementing processes – ASIIN – Partial compliance (2017) inconsistency in implementation of the process; unclear definition for cases where there is no site visit.
ASIIN
Application Renewal Review Full, coordinated by GAC Decision of 20/06/2017 Standard 2.3 Implementing processes Keywords inconsistency in implementation of the process; unclear definition for cases where there is no site visit. Panel conclusion Substantial compliance Clarification request(s) – RC decision Partial compliance “The review report noted that on-site visits are not mandatory in evaluations (type 1) and recommends that ASIIN should establish clear principles to state in which cases on-site visits are not necessary. Given the current absence of such principles, the Register Committee considered that ASIIN did not comply with the requirement to normally include a site visit. In its additional representation, ASIIN specified that site visits were a mandatory element in all type-1 evaluations. While the Register Committee welcomed the clarification, it underlined that the clear implementation in practice cannot be assessed at this stage; it should thus be subject of the next external review of ASIIN. The review report further identified cases where ASIIN did not follow the principles established in its own policy regarding the use of evaluation results for programme accreditation. The Register Committee took note of ASIIN’s statement on the report, which confirms that fact but does not include an explanation or rationale for departing from the policy. The Register Committee therefore considered that ASIIN did not implement its own processes consistently in all areas. Despite the fact that ASIIN stated in its additional representation that this was “one case among hundreds of procedures” and announced that it was planning to amend its own policy to the effect that a prior evaluation result could be used, provided is is not older than 2 years, the Register Committee noted that ASIIN's current policies were not always followed in practice, even if this was so in only very few cases.”
Full decision: see agency register entry